§ 115-4. Review of permit application.
Latest version.
-
The responsible person shall review all permit applications to determine whether proposed building sites will be reasonably safe from flooding. If a proposed building site is in a flood-prone area, all new construction and substantial improvements, including the placement of manufactured homes, shall be:A.Designed (or modified) and adequately anchored to prevent floatation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy;B.Constructed with materials and utility equipment resistant to flood damage;C.Constructed by methods and practices that minimize flood damage; andD.Constructed with electrical, heating, ventilation, plumbing, and air-conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding.